Tallahassee Community College
Through a performance contract with Siemens, TCC will use new building technologies and make capital improvements that are designed to reduce energy use and operational costs. The total projected savings over the 15-year life of the contract include more than $8.6 million in energy savings and nearly $750,000 in operational costs.
Through a performance contract with Siemens, TCC will use new building technologies and make capital improvements that are designed to reduce energy use and operational costs. The total projected savings over the 15-year life of the contract include more than $8.6 million in energy savings and nearly $750,000 in operational costs.